Client Case Studies
Canonbury Square, Islington
Overview
Utilities project for the installation of multiple underground governor units to connect the medium and low pressure networks in the area, for reinforcement and stabilisation of the local low pressure domestic gas network.
Our Solution
Role: Health, Safety, Quality and Environmental project lead.
Client: National Grid, Care of tRiiO (Skanska)
Utilities project Underground Multiple governor system installation for domestic gas distribution. The project included long term deep excavation and reinforcement installation. Drilling and modifying of existing buried gas utility systems. Removal and reinstatement of existing features including both hard and soft landscaping items.
The Olivier Theatre, London
Overview
Technical Replacement of Theatrical Systems within the Olivier Theatre
Our Solution
Role: Principal Designer
Client: The Olivier Theatre, National theatre
The technical replacement of theatrical systems within the Olivier Theatre encompassed the comprehensive upgrade and renewal of several critical components, including electrical supplies and distribution, production lighting, working lights, production sound and video, as well as stage engineering and rigging. An extensive overhaul to modernize the theatre's infrastructure, ensuring it met with contemporary standards and can support the diverse and demanding requirements of theatrical productions.
The Royal Opera House
Overview
The installation project at the Royal Opera House, was completed under both CDM Regulations and NIC EIC (The National Inspection Council for Electrical Installation Contracting).
Our Solution
Role: Principal Designer
Client: Royal Opera House
The installation project at the Royal Opera House, was focused on the replacement of the auditorium houselights including cabling, controls systems and units.
Preparation and onsite works included the management of working around asbestos containing materials and protecting the existing structures within the building.








